'geotechnical, tunnel boring, differing site conditions'

\n

GeoConSol
Geotechnical & Tunnel Consultants

A consultant is a universal observer who can look at a problem outside the environment in which the problem came to be, thereby creating a solution that was never possible before.  Fernando Flores

spacer
nn nn nn
nn
A-Misrepresentations
B-Type 1 or 2?
C-Jacked Pipe Failure
D-Top of Rock
E-PI Litigation Support
F-Geotech Assessment
G-Microtunneling Hard/Soft
H-Machine Failure
I-Boulders-Tunnel Boring
J-Boulders-Microtunneling
K-Plowing Utilities
L-Rock Socket Overrun
M-Bored Tunnel Inflow
N-Rock Comminution
O-Sub-Std TBM Performance
P-Bored Tunnel-Shear Zone
Q-Disputes Resolution
R-Problem Proj. Completion
S-Bored Tunnel Overbreak
T-Auger Sampling Problems
U-Bored Tunnel Delay
V-Hoe Ram - Failure to Rely
Peter J. Tarkoy
geotechnical, exploration, assessment, evaluation, Tarkoy, GeoConSol

Geotechnical Assessment
---on behalf of many contractors---

Far too often, during geotechnical exploration the need for "more information", more borings, more tests, more investigation is a common refrain. In one case, we provided anticipated rock intact and mass properties, excavation rates, and potential hazards, based on simple classical geotechnical thinking, whereas the hazards were not uncovered by the sophisticated investigation.

Physiography and Geomorphology

The anticipated ground conditions in the Oso Tunnel in Colorado were explored by borings and geophysical investigations.
None of the physical (borings) or geophysical exploration revealed the presence of adverse conditions.
Simple observation of the terrain, topographic maps, landforms, and arial photography were neglected. A simple examination of topographic maps and arial photos revealed many landslides, one major one crossing the tunnel alignment and comprising the first 400m of tunnel.

Construction Performance

Tunnel boring excavation was normal for the first 400m. Suddenly, the tunnel penetrated unconsolidated material with a high water inflow.

After the tunnel collapse, drill holes from the surface and ahead of the face revealed:

1. the 400m excavated portion of the tunnel was a landslide block (see profile below),
2. the 230m of unconsolidated material ahead of the face was the failure surface below the landslide block (see profile below),
3. the 230m of fault zone was excavated by hand in 7 months,
4. the remaining 6km also took 7 months by TBM.

A simple examination of the landforms on topographic maps or arial photos would have revealed the landslide block and fault zone.



Landforms


Landforms convey the underlying materials, major rock mass characteristics, and major features.

Lithology / Karst Features


Lithology conveys associated landforms underlying materials, major rock mass character, and major features relevant to underground construction.

 

Geological & Physiographic Provinces


Regional Geology conveys the genesis, rock types, and rock mass characteristics of the land.