Boston Central Artery 
Ceiling Panel Failures
 



Requirements for investigating ceiling panel failures, Boston Central Artery:

  • design (context)

    1. engineering design standards

    2. eminent and imminent safety considerations & standards

    3. associated and inescapable moral responsibilities 

  • design (content)

    1. engineering calculations 

    2. strength & deformability of mechanical components

    3. practical establishment of factors of safety (standards & calculations)

  • construction,

    1. specifications

    2. shop drawings

    3. modifications & approval

    4. conformance during installation

    5. inspection & testing

    6. procedural responsibilities

  • TOTALLY independent investigator / investigation (never having been associated with any of the parties involved)

Questions to be asked:

  • what was basis of:

    • design,

    • the specifications,

    • modification (if any),

    • approval of modifications and/or shop drawings,

    • construction/installation, and

    • approval of final installation?

  • what was the role (paid function) of the designers, inspectors, construction managers, and contractors?

  • what was the hierarchy of responsibility?